Duodao Hi-tech District,Jingmen,China
Info@bosaenergy.cn
+86 135 2379 1950

Our 4MWh Distributed Energy Storage Commercial Operation Project is Put Into Operation Smoothly

On September 26, the 4Mwh distributed energy storage operation project of Xiangyang enteen Yulong Transmission System Co., Ltd. was officially accepted. The project is operated and managed by our company, which marks the formal start of the contract energy management   cooperation with enteen Yulong Co., Ltd. The cooperation period of the project is 10 years, and 2.14 Million Kwh of electricity can be saved for the park every year. It is estimated that the total coal equivalent is about 7700 tons during the operation period, achieving good social and   environmental benefits. The project will become a distributed energy storage demonstration power station in Xiangyang City and even Hubei Province, which will promote the demonstration and application of large-scale energy storage.

Share this post
Facebook
WhatsApp

From our products

Custom universal 48V 2,4kWh Battery pack
2026/06/26
Voltage nominal: 48 VDC 15S Chemistry: LFP Capacity: 50Ah Max power: 200A (<5 sec) Protection: IP67 Energy 2,4 kWh
LF100LA
2026/06/24
Cell Model:LF100LA Nominal Capacity(Ah):102 Nominal Voltage (V):35.2 Nominal Energy (kwh):3.59
NMC 117Ah Battery Module
2026/06/23
Cell Model:NMC117 Nominal Capacity(Ah):117 Nominal Voltage (V):22.44 Cycle Life:>2000 cycles 80% SOH and 2800 cycles @ 70% SOH Data Collection: CCS or Cable
NMC 58Ah
2026/06/23
Cell Model:NMC58 Operation Temperature: Charge:-30~55℃;Discharge:-30~55℃ Cycle Life:>2000 cycles 80% SOH and 2800 cycles @ 70% SOH  