Duodao Hi-tech District,Jingmen,China
Info@bosaenergy.cn
+86 135 2379 1950

10Mwh Energy Storage Project to Grid Operation,Energy Saving and Consumption Reduction Help Enterprises Resume Work and Resume Production

With the resumption of work after the epidemic, enterprises actively resume production. We strive to help the economic recovery of enterprises in the aspects of “saving electricity cost”, “reducing enterprise load” and “stabilizing logistics support”.

In April, our nearly 10Mwh energy storage operation projects have passed the acceptance and officially put into operation in Foshan and Shenzhen. They are 4Mwh distributed energy storage operation project of Foshan xinlianfa Ceramics Co., Ltd.,4Mwh distributed energy storage operation project of Foshan Gaoming Haineng Technology Co.,Ltd. ,and 1.2Mwh distributed energy storage operation project of Shenzhen Maibo Electric Appliance Co., Ltd.

At present, all enterprises are in urgent need of increasing revenue and reducing expenditure, promoting economic recovery, and adopting the operation mode of “valley filling and peak releasing”, which can greatly reduce the electricity cost of industrial and commercial enterprises, and has a significant effect in slowing down the expansion and reducing the demand. It can also be used as a standby power supply in emergency response to sudden situations.

Share this post
Facebook
WhatsApp

From our products

72V 105Ah Golf Cart Battery Pack
2026/01/30

76.8V-105Ah Battery chemistry Lithium Iron Phosphate No […]

48V 230Ah Golf Cart Battery Pack
2026/01/30

48V-230Ah Battery chemistry Lithium Iron Phosphate Nomi […]

48V 150Ah Golf Cart Battery Pack
2026/01/30

48V-150AH Battery chemistry Lithium Iron Phosphate Nomi […]

48V 125Ah Golf Cart Battery Pack
2026/01/30

48V-125AH Battery chemistry Lithium Iron Phosphate Nomi […]

More from the New